Over the next 10 links you and a partner will design and 3D print one section of a giant class machine: every stage starts the next, every part is printed, and every section passes the ball to the one after it. Then the whole class runs it on Relay Day.
Need to log into Minecraft Education, Canva, or any other app that asks you to sign in? Most school and app accounts use the same login: your username is [email protected] (add a number if your name needs one, e.g. firstname.lastname2), and your password is the same one you use to log into your school computer.
Every project has at least one thing to hand in. Log into connect.det.wa.edu.au with your firstname.lastname and computer password, then head to your class and open the Submission section. Handing in more than one file? Zip them together first - total size must stay under 50MB.
With a partner, design and 3D print one section of a class chain reaction machine that catches the ball from the section before, runs 3 to 4 stages, and passes the ball to the section after, every single time.
| Criteria | Sketch (0-1) |
Rough Run (2-3) |
Reliable (4) |
Relay Ready (5) |
Score |
|---|---|---|---|---|---|
| Design & Modelling | Few parts modelled, or the funnel and chute do not match the Standard Gate | Most parts modelled, funnel and chute close to the spec, most design rules followed | Every part clean and printable, funnel and chute exactly to the spec, 3 or more stages | Stages flow neatly on one desk, parts are tidy and reusable, and every gap is deliberate | / 5 |
| Mechanisms | Stages do not move or do not pass to the next | Most stages work but some hand-offs fail | Every stage and hand-off works, including a pivot (seesaw or flap) | Mechanisms are clever and reliable, and the section runs 10 to 20 seconds | / 5 |
| Testing & Fixing | No coupon or test log | Coupon and some success rates recorded, with at least one fix | Success rates for every stage, and fixes written as evidence, change and reason | Fixes proven by new success rates, and the section reaches 10 out of 10 | / 5 |
| Relay & Teamwork | Section not ready for the relay, or partner work very uneven | Section docked for the relay with some help | Docks with both neighbours, clear reset card and fix plan, fair partner work | Hand-offs work every time, fixes made calmly between attempts, and feedback acted on | / 5 |
| Total | / 20 | ||||
| Ball | The class ball: a 20 mm printed sphere. Your teacher prints every ball from one file, so they all match |
| Input funnel | Opening 50 x 50 mm, rim 50 mm above the desk, its centre 30 mm in from the left edge and 150 mm back from the front edge |
| Output chute | The ball leaves the chute 60 mm above the desk, 20 mm past the right edge and 150 mm back from the front, rolling straight right |
| Run time | About 10 to 20 seconds from the ball landing in your funnel to your ball leaving your chute |
| Channel | Inside width a little bigger than the ball. Your coupon decides how much |
| Walls | At least half the ball's height (10 mm) so it can't jump out on a bend |
| Slope | Steep enough to keep rolling, gentle enough not to fly off the end. Your coupon decides |
| Ends | Every track end lines up flush with the next piece. A 1 mm step can stop a ball |
| Pivot | Hole = pin + 0.3 to 0.5 mm so the arm swings, not sticks |
| Balance | Rest the arm with the landing end up: a small weight on the other end holds it there |
| Cup | A shallow cup on the landing end so the ball doesn't bounce off |
| Stop | A block on the stand so the arm can't swing past where you need it |
| Size | Every part fits inside 150 x 150 x 150 mm and sits flat |
| Walls | At least 1.2 mm everywhere, and 2 mm around sockets and pivot holes |
| Gaps | Pivots use the moving gap, track joints the snug one |
| Gate | Funnel and chute match the Standard Gate numbers exactly |
| Bases | Every standing part has a wide flat base so a passing ball can't knock it over |
| How | Runs that worked, out of 10. 7 out of 10 is 70% |
| Why 10 | One good run can be luck. Ten runs show how reliable a stage really is |
| Chain maths | Stages that each work 9 times in 10 only all work together about 7 times in 10 for 3 stages |
| Goal | Every stage at 10 out of 10 before Relay Day |
| Evidence | "Ball stopped on track 2, 6 runs out of 10" |
| Change | "Make track 2 one slope step steeper" |
| Reason | "On the coupon, the next slope rolled the ball 5 out of 5" |
After 10 links of designing, testing and tuning, every section lines up desk to desk. The class gets three attempts at one unbroken run from the first funnel to the last chute, then votes for the awards.
Find your partner and sketch your section // Link 01